Estate Swing Manuale delle Istruzioni Pagina 23

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 22
2.14
12. Close the gate leaf. With the operator attached on the post side, move the end of the arm to
the gate and, keeping the gate operator in a perfectly horizontal position, determine the gate
mounting position. The arm should already be in it’s full closed length that was determined in
step 9.
13. Attach the gate mounting bracket
using carriage bolts, nuts, and washers.
14. Release the gate operator once
more.
Manually test the gate by completely
opening and closing it, checking for hin-
drances.
Gate in Closed position
Vedere la pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 47 48

Commenti su questo manuale

Nessun commento